abstract (초록)
With recent rapid advancement of BIM technologies, recognized research work for
Utilizing BIM has been conducted for increasing construction efficiency. However,
most of the previous studies were limited to reflect that why applying BIM is
difficult. This study compares the efficiency of BIM according to the type of public
buildings. Because public buildings are built a lot
2. Main discourse
2.1 highrises building builds through some process.
Good new construction method of constructions and systematic construction order are required in plan as building which cause particular condition that is different from universal condition preservation and administration side design and space-time in general building and with use.
In highrise building systematic and basic
buildings beyond has been shattered by some unimaginable force like a
row of kicked-down sandcastles. Wind blows through the desolation,
keening with the sound of ten million dead souls. It scurries the ashes
into drifts, stark white in the moonlight against the charred rubble. A
TITLE CARD FADES IN:
LOS ANGELES, July 11, 2029
3 ANGLE ON a heap of fire-blackened human bones. Beyond the mound is
a
A beautiful golden sun is setting. The sky is on fire. The CAMERA starts to move downwards. A large neon sign rises into shot. It rests on top of a skyscraper and fills the frame. The building is neither past nor future in design but a bit of both.
Slowly we pan downwards revealing the city that spreads below... A glittering conglomeration of elevated transport tubes, smaller square buildings wh
building a
make-shift GALLOWS.
CUT TO:
??
EXT. CHURCH - DAY
Built of stone it is already centuries old. A VILLAGER stands
guard at the entrance. The Hooded Man approaches and WHISPERS
something in the Villagers ear, then holds up a GOLD PIECE.
??
INT. CHURCH - DAY
Dark and musty, lit only by shafts of LIGHT which flow in
through the windows. The Hooded Man follows the Villager
across the stone fl